Mr Brendan Scott
Biography/ Background
- 2009-present: EngTest Manager, The University of Adelaide
- 2007-present: Ph.D. Research Scholar, The University of Adelaide
- 2004-2009: URS Australia Pty Ltd, Senior Geotechnical Engineer (part-time 2007-2009)
- 2000-2004: Parsons Brinckerhoff (formerly PPK Environment & Infrastructure), Geotechnical/Structural Engineer.
- 1996-1999: Bachelor of Engineering (Civil), 1st Class Honours, The University of Adelaide
Career Summary
Currently
the Manager of EngTest, which is the commercial arm of the School of Civil,
Environmental & Mining Engineering at The University of Adelaide that
conducts commercial testing, consulting and contract research.
Currently
undertaking post-graduate research at The University of Adelaide on a topic
entitled “The impact of rolling dynamic compaction”; which is a ground
improvement technique used to achieve ground improvement in the construction
industry.
Approximately
8 years of consulting engineering experience gained in a variety of engineering
projects in several Australian States in the commercial, residential and
industrial sectors. Experience includes multi-storey buildings, major earthworks,
slope stability, transmission towers, wind farms, environmental impact
statements, railways and large-scale residential projects.
From
2007-present, undertaken lecturing, tutoring and demonstrating to 1st,
2nd, 3rd & 4th year Undergraduate students
and Masters by Coursework students studying subjects in Geotechnical
Engineering at The University of Adelaide.
Current
Committee Member of the Australian Geomechanics Society. Australian
representative on the Student and Young Members group of the International Society
for Soil Mechanics and Geotechnical Engineering.
Qualifications
- Bachelor of Engineering (Civil), 1st Class Honours, The University of Adelaide
Awards & Achievements
- 2007-2010: Faculty of Engineering, Computer and Mathematical Sciences Divisional Scholarship for post-graduate study
- 2007-2010: Broons Hire (SA) Pty Ltd Supplementary Scholarship for post-graduate study
- 2003: Joint Winner Young Geotechnical Professionals Presentation Evening, Australian
Geomechanics Society, SA Chapter
-
2003: Parsons Brinckerhoff, Adelaide Office, Technical Excellence Award
-
2002: Parsons Brinckerhoff, Adelaide Office, Superior Service Award
-
2002: Parsons Brinckerhoff, Adelaide Office, Outstanding Team Award for Portrush
Road Upgrade Project
-
2002: Rotary International Pride of Workmanship Award, Rotary Club of Adelaide
Parks
-
1999: Young Geotechnical Engineers Prize for South Australia, Australian Geomechanics
Society, SA Chapter
Teaching Interests
Lecturing
The University of Adelaide:
- Geotechnical Engineering Design III - 2009, 2010 (part)
- Civil and Environmental Engineering IA - 2010
- Geotechnical Engineering IIA - 2010 (part)
The University of Adelaide:
- Geotechnical Engineering Design III - Design Project Tutor - 2008-2010
- Geotech Engineering II - Tutor - 2008
University of South Australia:
- Building Structures & Geomechanics 2 - External Tutor (Geomechanics) - 2006-2007
- Building Structures 6 - External Tutor (Substructures) - 2006-2007
Demonstrating
The University of Adelaide:
- Expansive Soils and Footing Design - Practicals - 2008, 2010
- Geotechnical Engineering Design III - Practicals - 2007-2008
- Geteochnical Engineering II - Practicals - 1999; 2007-2008
- Construction and Surveying - Practicals - 2007-2008
Research Interests
PhD
Research Project: The Impact of Rolling Dynamic Compaction
Rolling
dynamic compaction is commonly used to achieve ground improvement in the
construction industry. However, there is a lack of information quantifying its
effectiveness that limits the use of the impact roller. The aims of this
research are to better quantify the effectiveness of the impact roller.
Measurements from field investigations are being undertaken to measure the
energy imparted by the impact rolling module to the ground and appropriate
testing methods recommended to quantify the effectiveness of the impact roller
for ground improvement for a range of soil types. This research involves both
field testing and numerical analysis.
Supervisors:
- Assoc Prof Mark Jaksa - Associate Professor,
School of Civil, Environmental & Mining Engineering, University of Adelaide
-
Dr William Kaggwa - Senior Lecturer, School of
Civil, Environmental & Mining Engineering, The University of Adelaide
- Dr Peter
Mitchell – Ground Engineering Technical Leader – Asia Pacific, Aurecon Australia
Pty Ltd
- Mr Derek Avalle - Business Development Engineer, Keller Ground Engineering Pty Ltd
Publications
Papers in refereed Journals
-
Scott, B.T. & Mitchell, P.W. (2007). 'Founding Piles on the Hallett Cove Sandstone in Adelaide: A Case Study'. Australian Geomechanics Journal, vol. 42, no. 2, pp 45-50.
-
Scott, B.T. & Mitchell, P.W. (2004). 'Witton Bluff Stabilisation'. Australian Geomechanics Journal, vol. 39, no. 1, pp1-8.
Papers in refereed Conference Proceedings
-
Avalle, D.A, Scott, B.T. & Jaksa, M.B. (2009). 'Ground energy and impact of rolling dynamic compaction - results from research test site'. Proceedings XVII International Conference on Soil Mechanics and Geotechnical Engineering, Alexandria, Egypt, October 5-9, pp. 2228-2231.
-
Suto K. & Scott, B.T. (2009). '3D treatment of MASW data for monitoring ground improvement at an uncontrolled fill site'. 20th International Geophysical Conference and Exhibition, February 2009, Adelaide.
-
Scott, B.T. & Jaksa, M.B. (2008). 'Quantifying the influence of rolling dynamic compaction'. Conference Proceedings, 8th Young Geotechnical Professionals Conference, pp 199-205, November 2008, Wellington, NZ.
-
Scott, B.T. & Suto K. (2007). 'Case study of ground improvement at an industrial estate containing uncontrolled fill'. Common Ground Proceedings, 10th Australia - New Zealand Conference on Geomechanics, vol. 2, pp 150-155, October 2007, Brisbane.
-
Scott, B.T. & Mitchell, P.W. (2006). 'Stabilisation of the Cliff Face at Witton Bluff'. Conference Proceedings, 7th Young Geotechnical Professionals Conference, pp187-192, October 2006, Adelaide.
Papers in unrefereed Conference Proceedings, Workshops & Seminars
-
Mitchell, P.W. & Scott, B.T. (2004). 'Earthworks used to develop a soft soil site into a heavy container facility', Earthworks Seminar Proceedings, Australian Geomechanics Society (South Australian Chapter), pp1-5, August 2004, Adelaide.
Professional Associations
- Committee Member, 2006-2009
- Webmaster 2007-2009
- Steering committee member
Career Detail
Geotechnical Engineering
- Wellington Weir
Geotechnical Investigation, Wellington,
South Australia, SA Water. Tasks included planning and conducting
over-water and land-based geotechnical investigations for the proposed
Wellington Weir project, which involved undertaking boreholes and cone
penetration testing to depths of up to 45 metres below river bed level. Tasks
included planning and conducting site investigation, analysis of in situ soil
testing and interpretation of results.
- Witton Bluff, Christies Beach, South
Australia, City of Onkaparinga.
Performed concept, preliminary and detailed designs and documentation of rock
and soil slope stability remedial measures for a 450 m section of the
cliffs at Witton Bluff. Tasks included
the design and supervision of the first reinforced earth wall for cliff
stabilisation works in South
Australia. Role included Superintendent of the works,
Project Manager, supervising all Geotechnical and Civil works, managing all
project budgets, contractors and sub-contractors on behalf of the client. Co-authored
a technical paper on this project.
- Soils Investigation for the Olympic Dam
Expansion EIS, Roxby Downs,
South Australia, Arup/HLA on
behalf of BHP Billiton. Desktop review,
site investigation and reporting to assess the soils affected by the proposed
Olympic Dam Expansion, featuring a proposed 330 km long water supply pipeline
and a 270 km long transmission line.
- City Central Tower
1, Adelaide,
Baulderstone Hornibrook. Geotechnical
site investigation consisting of deep boreholes (including diamond coring) for
21-storey building with a double level basement. Tasks also included review of pile design,
construction supervision of pile installation and pile testing, as well as
providing certification for over 200 piles on the project. Co-authored a technical paper on this
project.
- Tweed Heads Industrial Estate, Tweed Heads, New South Wales, Quattro
Developments. Tasks included planning
and conducting a seismic survey and geotechnical investigation, supervision of
earthworks and ground improvement by the impact roller, analysis and reporting
to determine the bearing capacity of a filled site for industrial
buildings. Co-authored a technical paper
on this project.
- BRL Hardy Warehouse, Outer Harbor, South Australia. Geotechnical
site investigation for proposed warehouse adjacent to container terminal. Tasks
included planning and conducting site investigation in soft estuarine muds and
sands, in situ soil testing, interpretation of results, settlement analysis and
reporting. Co-authored a technical paper
on this project.
- Adelaide Oval
Eastern Grandstand Redevelopment, South
Australia, McMillan Contracting. Undertook pile
design, construction supervision and certification of approximately 50 bored
piles for the Chappell Grandstands at Adelaide Oval.
- Davenport Substation Upgrade, Port Augusta,
South Australia, ElectraNet SA. Tasks
included planning and conducting the geotechnical site investigation consisting
of test pits, boreholes and insitu testing, undertaking an assessment of the
load carrying capacity of existing access roads & culverts, and undertaking
preliminary pile design for proposed 275 kV transmission towers as part of the
upgrade to the Davenport Substation. The
geotechnical site investigation involved a detailed services clearance and
full-time supervision by representatives from three different Aboriginal groups
who were monitoring cultural aspects of the project.
- Hindmarsh
Valley Dam Upgrade, Victor Harbor,
South Australia,
SA Water. Geotechnical investigation and
full-time construction supervision of the installation of over 160 stone
columns for foundation treatment works at the downstream toe of the dam as part
of the Hindmarsh Valley Dam upgrade.
- Mt Millar Wind Farm, Cowell, South Australia, Powercorp. Tasks included undertaking the geotechnical
investigation (diamond cored drillholes and test pitting) at each of the 35
turbine locations for the Mt Millar wind farm on the Eyre
Peninsula. Tasks also
included undertaking the site investigation, reporting and recommendations for
footings, roads and earthworks at the new Mt Millar Substation.
- Kevin Gypsum Mine, Penong,
South Australia, Gypsum Resources Australia. Undertook the geotechnical site investigation
consisting of boreholes at proposed locations for future mine infrastructure,
as well as installing several groundwater monitoring wells and undertaking
environmental testing around the mine perimeter for the proposed mine
expansion.
- Geotechnical Investigation for the Pimba to
Olympic Dam Railway Line, Roxby Downs, South Australia, Arup on behalf of BHP
Billiton. Site investigation and
reporting for the proposed railway extension from Pimba to Olympic Dam.
- Portrush Road Upgrade, South Australia,
Transport SA. Footing design, structural design of over 100 new masonry walls
and construction inspections for new fences along Portrush Road as part of road
widening/upgrade between Greenhill and Magill Roads. Tasks included the design
of several retaining walls and a wall design over a 5 m wide creek crossing.
- Snuggery to Mayurra 132 kV Transmission Line,
Millicent, South Australia, ElectraNet SA. Geotechnical site investigation and
design of piles for transmission line between substation and wind farm. Site
investigation included planning and conducting site investigation, in situ soil
testing, interpretation of results and reporting.
- Hirotec Automotive Closures Plant, Elizabeth
West, South Australia,
McMillan Contracting. Undertook pile design check, supervision of pile
construction and pile load testing, certification of approximately 175 piles
for the automotive closures facility.
- South
Road / Port
Road Tunnel, Department of Transport, Energy &
Infrastructure. Supervision of the site
investigation consisting of boreholes, standard penetration testing, cone
penetration testing and dilatometer flat plate testing for the proposed tunnel
project.
- Westwood Development, Ferryden Park, South Australia,
Urban Pacific Limited. Earthworks
inspections and certification of filling for several hundreds of residential
allotments.
- Colonnades Shopping Centre Redevelopment, Noarlunga, South
Australia, McMillan Contracting. Undertook pile
design check, supervision of pile construction and pile load testing,
certification of approximately 500 bored piles for the redevelopment of
Colonnades Shopping Centre.
- Slope Stability investigation of open cut mining
site, Mindarie, South Australia, Southern Titanium.
Modelling and slope stability assessment of open cut mine walls up to 14 m
high in layered sand deposits.
- Preliminary Soil Reports and Footing
Recommendations for The Sanctuary
Village, Shoalhaven,
Cascades and Mawson Central Precincts, Mawson Lakes, Delfin Limited. Preparation of allotment specific reports for
several hundreds of allotments.
- Cement Mill 2 Geotechnical Investigation, Birkenhead, South Australia,
Adelaide Brighton
Cement. Tasks included supervising the
geotechnical investigation and reporting for the proposed Cement Mill project.
- Torrens
Island Power Station Western Feeder
Upgrade, Torrens Island, South Australia, Consolidated Power
Projects. Planning and supervising
geotechnical investigation and services clearance for 66 kV transmission
towers.
- Queen Elizabeth Hospital Redevelopment,
Woodville, South Australia, Australasian Piling Company. Pile design and
construction supervision of approximately 400 driven piles for new three-storey
inpatient building.
- Fernbank Avenue Retaining Wall, Golden Grove,
South Australia, Delfin Limited. Undertook the design of a new 4 metre high
precast concrete/steel column retaining wall. Tasks included construction
supervision of piles and precast panels in the role of superintendent on the
project.
- Morphettville Racecourse Wetlands, Morphettville, South
Australia, Patawalonga Catchment Water Management
Board. One of two geotechnical engineers for the wetland project. Tasks
included site investigation, interpretation of soil testing results and
reporting.
- Walpeup Grain Storage Facility, Walpeup, Victoria,
Ausbulk. One of two geotechnical engineers conducting the site investigation,
in situ soil testing analysis, interpretation of results and report
preparation for new grain storage structures.
- Anzac
Highway Streetscape 2000, Glenelg, South Australia.
Carried out design of 50 m long retaining wall in road median strip, as well
as footing design and construction inspections for various signs and light
poles.
-
Woolworths/Big W, Gawler, South Australia.
Design of retaining walls and raft footings for supermarket. Construction
inspections of footing beams and retaining walls during earthworks stage of
project.
Career Detail
Project Management & Construction Supervision
- Atrium Roof and Eastern Facade, Innova 21
Building, The University of Adelaide.
Tasks included assisting with calibrations, reporting and site work for
the real‑time monitoring of atrium roof cables and eastern façade tensioning
rods during tensioning; attending several project meetings, client liaison,
managing project timeframes and budgets.
- Port River Expressway Opening Bridge (Road),
Port Adelaide, Abigroup. Tasks included
attending client meetings, helping to determine appropriate instrumentation
equipment for measuring loads on bridge support bearings, managing project
timeframes, assisting with the installation of equipment on site and analysis
and reporting of project data.
- Cyclonic testing, Regency Park, Various clients.
Tasks include project managing the testing of various steel roof sheeting and
wall cladding materials in accordance with relevant Australian Standards; site
work, managing budgets, deadlines and client expectations.
- Coastal Modelling, The University of Adelaide, Laboratory
Wave Basin, Coastal Engineering Solutions.
Tasks included assisting with laboratory work in creating a 1:40 scale
model within the laboratory of the proposed seawall for Bastion Point, Mallacoota, Victoria. Other tasks involved determining material quantities,
developing project budgets, client liaison, re‑commissioning of laboratory space and
equipment.
- Extension to Adelaide Motors, Adelaide, Aurecon
Group. Tasks included conducting site
work and reporting for the real‑time monitoring of fifteen bars during
tensioning, managing tight timeframes and client liaison.
- Rail Wagon Acceleration Stability Testing,
Crystal Brook, South Australia, Various clients. Tasks included attending client
meetings, project managing site work, budgets and coordinating technical reports
for several rail wagon acceleration stability tests.
- Strain gauge monitoring of test section of gas
pipeline, Adelaide, Incospec & Associates Australia. Tasks included
assisting with calibrations, managing project timeframes, analysis and
reporting of project data.
- Material testing, Adelaide. Various
clients. Tasks include project managing
testing of various steel, concrete, timber and soil samples; determining
relevant Australian Standards appropriate for testing and managing budgets, deadlines
and client expectations.
- Witton Bluff, Christies Beach, South Australia,
City of Onkaparinga. Full time Level 1 construction supervision for the full 3
month duration of the project. Tasks included the design and supervision of the
first reinforced earth wall for cliff stabilisation works in South Australia. Role included
Superintendent of the works, Project Manager, supervising all Geotechnical and
Civil works, managing all project budgets, contractors and sub-contractors on
behalf of the client. Tasks also involved scoping up additional works during
the construction phase, including the upgrade of 1.5 km of existing rock
revetment.
- Port of Brisbane Motorway Alliance, Brisbane,
Queensland, Queensland Motorways, Leighton Contractors, Parsons Brinckerhoff
Australia, Coffey Geosciences. Full-time site supervision for two months
duration during the construction phase of project. Tasks included inspecting
and signing-off construction work on seven bridges, practical completion
inspections of storm water drainage and all retaining walls on the project.
- Pacific International Hotel, Hindmarsh Square,
Adelaide, South Australia, McMillan Contracting Pty Ltd. Undertook Piling
supervision and certification of 64 bored piles for new 8-storey apartment
building.
- Gawler TAFE, Gawler, South Australia.
Carried out construction inspections of two-storey steel-framed precast
structure from earthworks stage through until practical completion.
- Hurtle Square Apartments, Adelaide, South
Australia, Australasian Piling Company. Undertook piling supervision and
certification of 120 bored piles for new three-storey apartment building.
- Anangu Pitjantjatjara Stores, South Australia,
Anangu Pitjantjatjara Services Aboriginal Corporation. Construction inspections
for the upgrade to the Amata Community Store. Practical completion inspection
for the Mimili Community Store. Final completion inspections for the Community
stores at Fregon and Pipalyatjara.
- Elder House, Adelaide, South Australia,
Van Der Meer Engineers. Undertook construction inspections of post-tensioning
and reinforcement for 8 storey building. The project also included the
upgrading of an adjacent heritage building, which involved atrium design and
penetrations through existing beams and slabs.
- Yarra’s Edge Building
One, Victoria, Mirvac Group. Carried out construction inspections and
certification of precast panels for an 8-storey apartment building
Career Detail
Structural Engineering
- Woolworths, Hollywood Plaza, South Australia.
Undertook structural design and construction inspections for major upgrade to
an existing supermarket. Tasks include the design of footings, precast panels
and structural steelwork including the design of two trusses (with spans of 23
m and 16 m, respectively) to enable removal of existing load bearing columns.
Construction inspections from earthworks stage until practical completion,
including design and inspections during shop fit-out period.
- Mackenzie Warehouse, Outer Harbor, Mackenzie
Freightliners. Undertook structural design and construction inspections of
warehouse (67 m long with a 34 m wide portal frame and a suspended slab at
mezzanine level).
- Adelaide Casino, Adelaide, South Australia.
Undertook preliminary structural design for major upgrading to the existing
building to create a new entrance from North Terrace, alterations,
strengthening and restoration of 1920’s heritage listed Railway Station
building into public gaming area for the Adelaide Casino. Tasks included the design of a new steel
truss to enable the removal of an existing concrete column, strengthening of
existing trusses to support new floor loads, as well as the design of new
steel-framed mezzanine and first floors.
- Port of
Brisbane Motorway Alliance,
Brisbane, Queensland,
Queensland Motorways, Leighton Contractors,
Parsons Brinckerhoff Australia,
Coffey Geosciences. Tasks included inspecting and signing-off construction work
on seven bridges, undertaking design checks, minor design and construction
supervision work on bridge superstructures and road barriers and retaining walls.
Design of road signage and road furniture.
- Anangu Pitjantjatjara Stores, South Australia,
Anangu Pitjantjatjara Services Aboriginal Corporation. Structural design of new
precast community stores at Pipalyatjara, Fregon & Mimili. Structural
design of new steel framed community store at Oodnadatta. All designs had to be
constructible using minimal large machinery and to enable construction to occur
in remote areas of north-western South
Australia.
- Cement Mill 6 upgrade, Birkenhead,
Adelaide Brighton Cement. Undertook structural design and construction
inspections for new acoustic enclosure surrounding Cement Mill 6. Designed
slab for new water-cooling system, as well as support frame for cement cooler,
computer modelling of conveyor gantry trusses, various monorail beams and
support frames in the Cement Mill 6 building.
- Office Design, Port Adelaide, South Australia.
DM Lawrence. Structural and geotechnical design of three, two-storey steel
framed, precast office buildings on the banks of the Port River.
-
West Lakes Power Upgrade Works, West Lakes Mall, Protech (Australia).
Design of new platform above existing roof level to support new electrical
units
Career Detail
Civil Engineering
- Witton Bluff, Christies Beach, South
Australia, City of Onkaparinga.
Role included Superintendent of the works, Project Manager, supervising all
Geotechnical and Civil works. Tasks also involved scoping up additional works
during the construction phase, including the upgrade of 1.5 km of existing rock
revetment.
- Port of Brisbane Motorway Alliance,
Brisbane, Queensland,
Queensland Motorways, Leighton Contractors,
Parsons Brinckerhoff Australia,
Coffey Geosciences. Full-time site supervision for two months duration during
the construction phase of the $130 m project. Tasks included inspecting and
signing-off construction work on seven bridges, practical completion
inspections of stormwater drainage and all retaining walls.
- Stormwater design, Golden Grove, South Australia.
Carried out stormwater and footing design for proposed workshop at Golden
Grove.
-
Mackenzie Warehouse,
Outer Harbor, Mackenzie Freightliners. Undertook design and construction
inspections of two culverts (4 m wide) to support 90 tonne axle loads.
Entry last updated: Thursday, 3 Feb 2011
The information in this directory is provided to support the academic,
administrative and business activities of the University of Adelaide.
To facilitate these activities, entries in the University Phone
Directory are not limited to University employees.
The use of information provided here for any other purpose, including
the sending of unsolicited commercial material via email or any other
electronic format, is strictly prohibited. The University reserves the
right to recover all costs incurred in the event of breach of this
policy.
|