Health Sciences Infrastructure Strategy - Stage 2

The Health Sciences Infrastructure Strategy Stage 2 project considers Faculty needs within the North Terrace precinct and CBD. It aims to determine the best locations and use of facilities for staff and student activity which have not relocated to the Adelaide Health and Medical Sciences building.

If you require detailed information about construction works and noise/vibration disturbances please email Greg Badger to register for the HSIS Stage 2 distribution list.

HSIS Stage 2 Distribution List

Information sessions and display centre

From Monday 25 September to Friday 29 September the HSIS project team will be running a series of information sessions on level 3 of Medical School South for Health Sciences staff. On display will be floor plans, look and feel boards, concept drawings, and infomation about how to reduce your storage.

Architects from Design Inc and project manager Greg Badger will be onsite to field any questions you may have about the project and how it will impact you. View the times below:

  • General display
    Monday 25 - Friday 28 September
    9am - 5pm

  • Design Inc. Architects
    Monday 25 September
    1 - 2pm

  • HSIS2 Project Manager
    Wednesday 27 September
    3 - 4 pm
    Friday 29 September
    10am - 12pm

  • Presentations
  • Project Objectives

    Through consultation with the project Executive Group and the Health Sciences staff through the recent round of workshops, the Project Objectives for the HSIS2 project has been developed.

    These relate primarily to the benefits that will come out of the improved infrastructure, co-location and synergies achieved by more of the Faculty working physically closer together.

  • Project Documents

    *Please note: The Design Brief is indicative and subject to change. Consultation and review feedback is continually being fed into the documents and they will continue to be refined until signed off at the 100% design phase. Please contact your manager or submit a feedback form below to clarify any queries you may have regarding these documents.

    The document above outlines the HSIS S2 project governance structure. The governing body, the Executive Group, provides high-level strategic approvals, advice and recommendations on matters relating to the planning, design and development of the infrastructure for the FHMS (excluding the AHMS building).

  • Space Guidelines

    The University has developed a set of guidelines around how we use spaces across all campuses. They help ensure design 'best practice' is adhered to, and that both new builds and refurbishments make good use of the available space for teaching, research and professional purposes.

    The guidelines will clearly influence the design and use outcomes for the HSIS2 project.

  • Terms of Reference

    The Terms of Reference have been drafted and members of the project team are:

    • Alastair Burt (Chair)
    • Tony Cambareri
    • Virginia Deegan
    • David Haynes
    • Natalia Hubczenko
    • Ian Symonds
    • Andrew Zannettino

    In attendance:

    Kendra Backstrom, Greg Badger, Mick Guerin, Sonja Graetz, Robyn Aust, Wayne Dixon, Gavin Dixon.

  • Frequently Asked Questions

    View frequently ask questions related to the HSIS2 project.

  • Feedback

    Please complete the form below and a member of HSIS2 working group will respond to your query.

     HSIS2 Feedback
    * Indicates Required Information

    Comments



    Your Details



 

Infrastructure Branch

Maintenance Services:
+61 8 8313 4008
Campus Security:
+61 8 8313 5990
General Enquiries