The Consultants & Contractor Information on this page is issued as part of the induction process prior to working with the University on design and construction of built infrastructure.

Changes to Purchasing and Accounts Payable.

Online Contractor Induction Program and User Guide.

Design Standards

The UoA Design Standards specify the minimum, mandatory requirements for the design, construction and management of all University of Adelaide infrastructure projects. Requirements are specific to the University’s needs, and are over and above minimum mandatory authority requirements. They include both technical requirements for the finished product as well as methodological requirements for project delivery.

Design Standards
Document Heading Summary
Design Standard Volume A Part 1 & 2 Project Process Checklist
Design Standard Volume A Part 3 Project Process Checklist
Design Standard Volume B Building & Architecture
Design Standard Volume C Mechanical Services
Design Standard Volume D Electrical Services
Design Standard Volume E Communication Services
Design Standard Volume F Hydraulic Services
Design Standard Volume G Fire Services
Design Standard Volume H Security Services
Design Standard Volume I Vertical Transport Services
Design Standard Volume J External Works
Design Standard Volume K Documentation
Design Standard Volume L Metering & Monitoring
Design Standard Volume M Audio Visual
Design Standard Volume N Part 1, 2 & 3 Signage & Wayfinding
Design Standard Volume N. Part 4 Clause 4.1 Signage & Wayfinding - .pdf document

Consultants Package & Design Standards Reference Materials

Consultants Package            
Document Heading
Consultant Certification Schedule
Stakeholder Approval Schedule
Deed of Novation
Requests for ITS - Data and Voice Request Form
Minor Works Contract
Notification of Construction Start
Certificate of Compliance with Essential Safety Provisions
Conservation Management Plans

Contractor's Package

Contractor Management        HSW specific requirements for contractors
Document Heading Summary
Contractor Guide Contractor guide
AMP Asbestos Management Plan
Asbestos Register

Building Asbestos Registers Log in details:

User ID: contractor@uniadl.edu.au

Password: UniAdelaide

The Asbestos Register User Manual provides further instructions.

Roof Risk Register Roof Risk Register
Antenna Register Antenna Register
Confined Space Register Confined Space Register
Hazardous Substances Register Hazardous Substances Register
Service Interruption Application Service Interruption - Application to Maintain Service Centre
Permit/Permission to Work   Key requirements for high risk work
Document Heading Summary
Permit/Permission to work For work performed on behalf of the Infrastructure Branch
General PTW General permission to work form
Confined Space PTW Confined space permit to work form
Hot Work PTW Hot work permit to work form
Isolation PTW Isolation/ Live Work permission to work form
Asbestos Removal Control Plan Asbestos removal control plan
Right of Access Permit Access to leased or licensed buildings form (e.g. telecommunication towers)
 

Infrastructure Branch

Maintenance Services:
+61 8 8313 4008
Campus Security:
+61 8 8313 5990
General enquiries: Phone +61 8 8313 6110: Email: infrastructure@adelaide.edu.au